Installation and connection
5
Installation and connection
5.1 Preparing the pump assembly
5.1.1 Preparing the pump
5.1.2 Fitting the heat insulation (optional)
26
After storage times exceeding 3 months, observe measures for removing the
preservative (
1.
If the pump is to be put into operation immediately after installation and
connection: Remove preservative prior to installation (
'Removing preservative' on page 24).
2.
Carry out requisite measures after extended storage/standstill time
Ä Chapter 4.4 'Removing preservative' on page 24).
(
Type SLH-4U
Ä Chapter 4.4 'Removing preservative' on page 24).
Installation options:
–
With steel foundation frames (
system operating instructions)
–
With a concrete foundation (please consult with ITT Bornemann
GmbH)
DANGER!
Mortal danger due to explosion!
Observe the additional explosion protection instructions!
WARNING!
Risk of injury due to unprofessional work!
–
Only allow work to be carried out by technical specialists who
have the required knowledge and practical experience to do so:
–
Installation, initial commissioning, repairs, maintenance,
–
Work on the electrical and electronic systems.
–
Make personal safety equipment available.
–
Observe statutory or other safety and accident prevention regu-
lations.
NOTICE!
Property damage due to contamination!
–
Only remove the covers and transport locks immediately prior to
connecting the pipes with the pump.
For correspondingly ordered pumps only. Only needed to maintain
the temperature of the conveyed medium.
03/2020 JP Rev. 1
dimensioned drawing, pump
Ä Chapter 4.4