To Lower The Switch Box On The Indoor Unit; To Close The Indoor Unit - Daikin Altherma 3 R F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R F:
Table of Contents

Advertisement

6
|
Unit installation

6.2.5 To lower the switch box on the indoor unit

6.2.6 To close the indoor unit

Installer reference guide
46
During the installation, you will need access to the inside of the indoor unit. To
have easier front access, put the switch box lower on the unit as follows:
Prerequisite: The upper front panel and front panel have been removed.
1 Remove the fixing plate at the top of the unit.
2 Tilt the switch box to the front and lift it out of its hinges.
1
3 Place the switch box lower on the unit. Use the 2 hinges located lower on the
unit.
1 Close the cover of the switch box.
2 Put the switch box back into place.
3 Reinstall the top panel.
4 Reinstall the side panels.
5 Reinstall the front panel.
6 Reinstall the upper front panel.
NOTICE
When closing the indoor unit cover, make sure that the tightening torque does NOT
exceed 4.1 N•m.
T25
ERLA03DAV3 + EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1 – 2019.10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ehfz03s18dj3vErla03dav3

Table of Contents