To Connect The Changeover To External Heat Source - Daikin Altherma 3 R F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R F:
Table of Contents

Advertisement

8
|
Electrical installation

8.3.9 To connect the changeover to external heat source

Installer reference guide
92
2
1
X2M
7
9
A4P
Y2
YC
A
B
A
B
a
Installation of EKRP1HBAA is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT change.
3 Fix the cable with cable ties to the cable tie mountings.
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[A.2.2.6.1] Ext. backup heat src
1 Open the following (see
1 Top panel
2 Upper front panel
3 Upper switch box cover
2 Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
1+2
Wires connected to the alarm output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
required.
3
7
b
7
9
X2M
A4P
a
"6.2.4 To open the indoor
Y2
4
unit" [
 44]):
ERLA03DAV3 + EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1 – 2019.10
1
3
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ehfz03s18dj3vErla03dav3

Table of Contents