Finishing The Outdoor Unit Installation; To Finish The Outdoor Unit Installation - Daikin Altherma 3 R F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R F:
Table of Contents

Advertisement

6
|
Unit installation

6.5 Finishing the outdoor unit installation

6.5.1 To finish the outdoor unit installation

Installer reference guide
52
DANGER: RISK OF ELECTROCUTION
Make sure that the system is earthed properly.
Turn off the power supply before servicing.
Install the service cover before turning on the power supply.
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
1 Insulate and fix the refrigerant piping and cables as follows:
d
c
a
b
g
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g
Finishing tape
2 Install the service cover.
e
f
ERLA03DAV3 + EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1 – 2019.10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ehfz03s18dj3vErla03dav3

Table of Contents