Required Components; Required Tools - Christie Velvet Apex A2L Series Installation And Setup Manual

Led display system
Table of Contents

Advertisement

Term
Definition
Fill factor
Indicates the ratio between the area covered by pixels and the area not covered by pixels.

Required components

Ensure the necessary components are available before installing the LED panels.
Remote Power Supply Rack Shelf
E500 controller or E600 controller
Main power cables (from the Remote Power Supply Rack Shelf to the cabinet trunk harness)
Available in 6 m, 15 m, 30 m, 50 m, and 75 m lengths, and a 160 m spool.
Cabinet trunk harnesses
Cabinet to cabinet data cables
Cabinet to controller data cable

Required tools

Make sure the following tools are available during the installation.
Tile installation tools and hardware
Torque driver
M6 screwdriver
8 mm wrench
Magnetic LED module removal tool (P/N: 003-005735-XX)
Mounting block template (P/N: 003-005736-XX and 003-006156-XX)
Screws appropriate for the mounting surface. These screws are not provided by Christie.
Remote Power Supply Rack Shelf installation tools
Screwdrivers
Molex Crimping Tool (P/N: 154-124108-XX)
If the power cord supplied with your product is not long enough to connect the first display
panel in an array to the Remote Power Supply Rack Shelf module, you must purchase a power
cord of an adequate length. Christie recommends one of the pre-terminated power cables
offered as Christie accessories, or that you create a custom cable using the Christie Main
Power Cable Spool (P/N 154-122106-XX), Connector Kit (P/N 154-125109-XX), and Molex
Crimping Tool (P/N 154-124108-XX). For more information on the Molex Crimping Tool, see the
Molex documentation.
Velvet LED Display System Installation and Setup Guide–Apex A2L Series
020-102873-01 Rev. 1 (06-2018)
Copyright
2018 Christie Digital Systems USA, Inc. All rights reserved.
©
Product overview
8

Advertisement

Table of Contents
loading

Table of Contents