Installation And Setup; Installing An Led Array - Christie Velvet Apex A2L Series Installation And Setup Manual

Led display system
Table of Contents

Advertisement

Installation and setup

The configuration of an array depends on the installation. Use the following instructions as a guideline
only. Before you install an LED array, you must fully understand all site requirements and
characteristics.

Installing an LED array

Perform the following steps when you install an LED array.
A
Mounting blocks
B
Chassis
C
Carrier assembly
D
LED modules
1. Install the mounting blocks (A) (on page 18).
2. Mount the tiles (B) (on page 20).
3. Install the carrier assemblies (C) (on page 21).
4. Connect the data cables (on page 22).
5. Connect the power cables between tiles (on page 23).
6. Reinstall the LED modules (D) (on page 23).
7. Install and configure the Remote Power Supply Rack Shelf (on page 24)
8. Connect the tile power cables to the Remote Power Supply Rack Shelf (on page 25).
9. Connect the data cables to the video sources (on page 27).
10. Power on the array (on page 29).
Velvet LED Display System Installation and Setup Guide–Apex A2L Series
020-102873-01 Rev. 1 (06-2018)
Copyright
2018 Christie Digital Systems USA, Inc. All rights reserved.
©
17

Advertisement

Table of Contents
loading

Table of Contents