Installing The Chassis - Extreme Networks BlackDiamond 10808 Hardware Installation Manual

Extreme blackdiamond 10808: installation guide
Hide thumbs Also See for BlackDiamond 10808:
Table of Contents

Advertisement

Installing a BlackDiamond 10808 Chassis
Figure 25: Removing the Shipping Carton
Lift box off
chassis
Remove 4 bolts
holding chassis
to pallet
4 Remove the restraining bolts that hold the BlackDiamond 10808 chassis to the shipping brackets on
the shipping pallet (see
Continue with the instructions in
NOTE
Save the packaging, including the carton, bolts, and attached washers for future use, in case you need to return the
BlackDiamond 10808 switch.

Installing the Chassis

The BlackDiamond 10808 switch is shipped with a pre-installed fan tray. For your safety, because of the
increased weight of the chassis after components are installed and to prevent damage to the equipment,
Extreme Networks strongly recommends that you install the I/O modules after you mount the chassis
in a rack.
NOTE
Mount the chassis in a rack before installing any switch components.
You can install the chassis using either the attached rack mount brackets at the front of the chassis
(standard rack position) or the optional mid-mount brackets.
62
Figure
25).
"Installing the
Chassis"to install the chassis in an equipment rack.
EX_088B
BlackDiamond 10808 Switch Hardware Installation Guide

Advertisement

Table of Contents
loading

Table of Contents