5. Programming
Connection Check
Allows you to confirm the control box's connection to the main monitors and lift controllers.
5.2.4 Using the version 1 setup tool to edit data
1
Start the setup tool.
2
In the [Prepare the data] section, click [Check Files].
R The paths of each configuration file are displayed in the [Load and edit the data] section.
3
In the [Load and edit the data] section, click [Load / Edit ...] next to a configuration file that you want to edit.
R The files's details are displayed.
4
For [Room settings] for lobby stations 1–3
a. Click [Edit ...] to open the configuration file.
R Use a third-party text editor or spreadsheet program to open the configuration file.
b. Change the values in the appropriate columns, and then save the file.
c. In the setup tool, click [Reload].
R The content of the configuration is reloaded and displayed.
d. Click [Close].
For all other settings
a. Select the desired setting.
b. Enter the desired value in the [Edit Data] section.
R Acceptable values are displayed in a pop-up when you mouse-over the text field.
c. Click [Apply / Save] to save the settings to the configuration file.
d. Click [Close].
5
Repeat from step 3 for each configuration file that you want to edit.
R Files that are ready to be uploaded are indicated by [OK] displayed in the right side of the [Load and edit the
data] section.
6
In the [Upload the data to device] section, select the devices that you want to upload the data to and then click
[Upload].
Note:
R See 5.2.13 List of PC programming parameters (Page 53) for information about each parameter.
48