CHAPTER 3: INSTALLATION
To stack SEH non-intelligent hubs together:
1. Attach the SEH HubSTACK Interconnect cable to the "OUT" port on
the rear panel of the SEH as shown in Figure 3-7.
2. Attach the other end of the SEH HubSTACK Interconnect cable to the
"IN" port on the rear panel of the SEH next in the stack.
SEH HubSTACK
Interconnect Cables
SEHI HubSTACK
Interconnect Cable
If one end of a HubSTACK Interconnect cable is disconnected without
disconnecting the other end attached to the hub, disconnect the cable from
the OUT port as shown in Figure 3-8 to ensure that the HubSTACK
Interconnect cable is terminated properly.
3-8
SEHI Managing 4 SEH Non-Intelligent Hubs
HubSTACK
10BASE-T HUB
SEH-24
OUT
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
SEH-24
OUT
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
SEH-24
OUT
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
SEH-24
OUT
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
SEHI-24
SEH INTERCONNECT OUT
Figure 3-7. Stacking the SEHI
REAR VIEW
LANVIEW®
WITH
IN
LANVIEW®
WITH
IN
LANVIEW®
WITH
IN
LANVIEW®
WITH
IN
LANVIEW®
WITH
SEHI USER'S GUIDE
1490_10