Connecting An Aui Cable To An Epim-X - Cabletron Systems SEHI-22 User Manual

10base-t intelligent stackable hubs
Hide thumbs Also See for SEHI-22:
Table of Contents

Advertisement

CHAPTER 4: CONNECTING TO THE NETWORK

4.1.6 Connecting an AUI Cable to an EPIM-X

The Signal Quality Error (SQE) switch remains in the OFF
!
position for most network connections. However, some Data
Terminal Equipment (DTE) requires SQE. Refer to a DTE
CAUTION
manual for SQE requirement information.
To connect an EPIM-X to a device not requiring SQE:
1. Check that the SQE LED on the EPIM-X is off. If the SQE LED is on,
check the position of the SQE switch.
If the SQE light remains on, even though the SQE switch is in
the OFF position, contact Cabletron Systems Technical
NOTE
Support.
2. Attach one end of an AUI cable of up to 50 meters in length to the port
located on the EPIM-X (Figure 4-6) and connect the other end to the
intended node.
ON Position
(Toward Back
of EPIM)
4-10
OFF Position
(Toward Front
of EPIM)
Figure 4-6. The EPIM-X
1490_18
SEHI USER'S GUIDE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sehi-24

Table of Contents