Connecting An Aui Cable To An Epim-A - Cabletron Systems SEHI-22 User Manual

10base-t intelligent stackable hubs
Hide thumbs Also See for SEHI-22:
Table of Contents

Advertisement

CHAPTER 4: CONNECTING TO THE NETWORK
When internal termination switch
is set to off ( ):
Connect BNC tee-connector to port.
Attach a terminator or terminated
thin-net segment to one female
connector of tee-connector.
Connect a terminated thin-net
segment to other female connector
of tee-connector.

4.1.5 Connecting an AUI Cable to an EPIM-A

Ensure that the Signal Quality Error (SQE or "heartbeat")
!
test function is disabled on the external transceiver connected
to the SEHI. The SEHI will not operate and the network will
CAUTION
be unusable if the transceiver has the SQE test function
enabled. Refer to the applicable transceiver manual.
To connect an EPIM-A to an external network segment:
1. Attach an external transceiver to the network segment that will be
connected to the AUI port. Refer to the applicable transceiver manual.
2. Attach a standard AUI cable of up to 50 meters in length ("office" AUI
cable may be up to 15.5 meters in length) to the transceiver connected
to the network in step 1.
4-8
Attach thin-net segment directly to BNC
connector when internal termination
switch is set to on ( ).
Figure 4-4. The EPIM-C
1490_16
SEHI USER'S GUIDE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sehi-24

Table of Contents