To Mount The Uc Open Xp - Carrier UC Open XP Installation And Startup Manual

Table of Contents

Advertisement

Open the Properties page > Equipment tab to configure the controller. Each configuration parameter on
4
the Properties page > Equipment tab is explained in detail under the corresponding section. For
additional information on the operation of the equipment, consult the Sequence of Operation, which is
created in ApplicationBuilder, and the relevant Installation and Start-up Guide.
Check out and commission the equipment.
5

To mount the UC Open XP

When you handle the UC Open XP:
• Do not contaminate the printed circuit board with fingerprints, moisture, or any foreign material.
• Do not touch components or leads.
• Handle the board by its edges.
• Isolate from high voltage or electrostatic discharge.
• Ensure that you are properly grounded.
Screw the UC Open XP into an enclosed panel using the mounting slots on the cover plate. Leave about 2 in.
(5 cm) on each side of the controller for wiring.
Mounting hole dimensions 4" (width) by 11.4" (height).
UC Open XP/UC Open XP IO
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uc open xp io

Table of Contents