Preparations Before Dismantling/Assembly - Fayat Group DYNAPAC CC224HF Instruction Manual

Vibratory roller
Table of Contents

Advertisement

1
2
3
4
2021-01-14

Preparations before dismantling/assembly.

The machine should be standing on a level surface
with the engine switched off and the brakes on.
Make sure that the container is empty and does not
contain any extra material before dismantling.
Attach the lifting devices in the eyes on both sides of
the container.
1- Release the pin in the clamp and remove the clamp
from the machine.
2- The clamp is now fitted at the base of the container
as a foot.
3- Release the lock on the lower shaft.
4- Release the hydraulic hoses and cabling.
Plug the hoses (dust seals) with the enclosed plugs.
5- Now lift off the container with the requisite lifting
device and place on a level surface.
4812159601_H.pdf
Operation
83

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents