Alpha ESS Storion-T50 Installation Manual page 37

Energy storage system
Hide thumbs Also See for Storion-T50:
Table of Contents

Advertisement

Figure 4-18 PCS wiring copper bars designation with STS module
Table 18 PCS wiring copper bars description
Position
Designation
1
PV +
2
PV -
3
Battery +
4
Battery -
5
A (Load)
6
B (Load)
7
C (Load)
8
A (Grid)
9
B (Grid)
10
C (Grid)
11
N
12
Grounding
______________________________________________________________________
Installation
Description
PV positive port, dimension is shown as
below.
PV negative port
Battery positive port
Battery negative port
Phase A, dimension is shown as below.
Phase B
Phase C
Phase A
Phase B
Phase C
Phase N
Alpha ESS Co., Ltd.
Your Smart Energy
Page 35 of 48