Handling And Installation - Angelo Po 1G1CP2G Use And Installation Manual

Pasta cooker
Table of Contents

Advertisement

HANDLING AND INSTALLATION

Important
When handling and installing the appliance
comply with the information provided by
the constructor directly on the packaging,
on the appliance and in the instructions for
use.
The packaging is designed to reduce space and as
appropriate to the type of transport used. To simplify
transport, some components may be removed and
suitably protected and packed for transport.
The packaging carries all information necessary for
loading and unloading. When unpacking, check that
all components are present in the correct quan-
tities and are undamaged.
The packaging material must be properly dis-
posed of in accordance with legal requirements.
Different means of transport may be used, depend-
ing partly on the destination.
The chart shows the most commonly used alterna-
IT
tives.
During transport, fix the packaging to the means of
transport securely to prevent undesirable shifting.
AUS
DE
FR
The appliance can be handled using fork-lift or hook
ES
equipment of suitable load-carrying capacity.
Before lifting, check the position of the load's centre
of gravity.
Important
When engaging with the lifting equipment,
watch out for the gas supply pipe.
RECOMMENDATIONS FOR HANDLING AND INSTALLATION
PACKAGING AND UNPACKING
TRANSPORT
HANDLING AND LIFTING
If necessary, the person authorised to carry
out these operations must organise a "safe-
ty plan" to protect the people directly in-
volved.
- 10 -
IDM-3960200170.tif
Lifting
equipment
Means of transport
IDM-3960200180.tif
IDM-3960200190.tif
7

Advertisement

Table of Contents
loading

Table of Contents