9.
Remove the entire hydrostatic transmis-
sion cable.
Fitting the Hydrostatic Transmission
Cable
1.
Screw in the front link joint on the new
hydrostatic transmission cable and
tighten the lock nut.
2.
Run the cable through the rider so that it
follows the same path as the old cable
did.
3.
Make sure that the wire is pulled through
the cable duct underneath the bearing of
the articulated steering.
REPAIR INSTRUCTIONS
Remove the hydrostatic transmission cable.
Front link joint
Threading the cable
Under the articulated steering bearing
6019-009
6019-018
6019-022
8009-737
79
English-