Setup and installation
Mains connection HF spindle (optional)
Connection emergency stop
PC connection
32
Fig. 14: Electrical control box HF
1
Mains connection C14
2
Main switch
The HF spindle is premounted and connected to the machine. The frequency
inverter must be placed on a flat, stable surface and connected to the mains
supply (⮫ Chapter 5 'Technology Data' on page 13).
1
Fig. 15: Connection emergency stop
1
Connection emergency stop
The emergency stop button must be connected to the machine using the corre-
sponding connection point.
The PC must be connected to the machine using the corresponding connection
point. Procedure Eding CNC:
1.
Connect the machine to the controller with the 25 pin cable.
2.
Connect the controller to the PC using the USB cable.
2
1