Installing A Gs970M/18, Gs970M/18Ps Or Gs970M/28 Switch In An Equipment Rack; Figure 34: Attaching Rack Mount Brackets To The Gs970M/18, Gs970M/18Ps Or Gs970M/28 Switch - Allied Telesis CentreCOM GS970M Series Installation Manual

Managed gigabit ethernet switch
Hide thumbs Also See for CentreCOM GS970M Series:
Table of Contents

Advertisement

Installing a GS970M/18, GS970M/18PS or GS970M/28 switch in an
equipment rack
These instructions show you how to install a GS970M/18PS, 
GS970M/18, or GS970M/28 switch in an equipment rack. The rack mount
kit is AT-RKMT-J13 and can be purchased separately from your Allied
Telesis dealer. A rack mount kit is included with your GS970M/28 switch.
To install one of these switches in a 19-inch equipment rack, follow these
steps:
1. If rubber feet are attached to the base of the switch, remove them
(Figure 25 on page 55).
2. Attach two rack mount brackets to the sides of the switch using the six
bracket screws that come with the rack mount kit AT-RKMT-J13
(Figure 34).
F
34. A
IGURE
TTACHING RACK MOUNT BRACKETS TO THE
GS970M/18PS
GS970M/28
OR
M A
C A
d d
r e s
s L
a b
e l
GS9790M Series Switch Installation Guide
SWITCH
GS970M/18,
61

Advertisement

Table of Contents
loading

Table of Contents