Unpacking The Switch: Gs970M/18 And Gs970M/18Ps - Allied Telesis CentreCOM GS970M Series Installation Manual

Managed gigabit ethernet switch
Hide thumbs Also See for CentreCOM GS970M Series:
Table of Contents

Advertisement

Unpacking the switch: GS970M/18 and GS970M/18PS

To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
M A
C
A d
d re
s s
L a
b e
l
GS970M/18 or
GS970M/18PS
1 Power cable hook
GS9790M Series Switch Installation Guide
1 Power cable (1.8m)
1 Console cable (2m)
51

Advertisement

Table of Contents
loading

Table of Contents