Figure 35. Mounting Ags970M/18, Gs970M/18Ps Or - Allied Telesis CentreCOM GS970M Series Installation Manual

Managed gigabit ethernet switch
Hide thumbs Also See for CentreCOM GS970M Series:
Table of Contents

Advertisement

Chapter : Chapter 2: Installation
62
3. Mount the switch in a 19-inch equipment rack using four equipment
rack screws (supplied with the equipment rack) (Figure 35).
F
35. M
IGURE
OUNTING A
GS970M/28
SWITCH IN AN EQUIPMENT RACK
M A
C A
d d
r e s
s L
a b
e l
4. Go to "Cabling the switch" on page 69
GS970M/18, GS970M/18PS
OR

Advertisement

Table of Contents
loading

Table of Contents