Selecting A Site For The Switch - Allied Telesis CentreCOM GS970M Series Installation Manual

Managed gigabit ethernet switch
Hide thumbs Also See for CentreCOM GS970M Series:
Table of Contents

Advertisement

Chapter : Chapter 2: Installation

Selecting a site for the switch

48
You can install a GS970M Series switch on a desktop, in a standard 19-
inch equipment rack, or on a wall.
Observe the following requirements when choosing a site for your switch:
If you plan to install the switch in an equipment rack, verify that the
rack is safely secured and will not tip over. Devices in a rack
should be installed starting at the bottom, with the heavier devices
near the bottom of the rack.
If you are installing the switch on a table, verify that the table is
level and secure.
If you are installing the switch on a wall, ensure that the wall is
sturdy enough to hold the switch's weight. You may need to
position the switch so that it can be screwed into the wall's framing
timber or an equivalent structural element.
The power outlet for the switch should be located near the unit and
should be easily accessible.
The site should provide for easy access to the ports on the front of
the switch. This will make it easier for you to connect and
disconnect cables, as well as view the switch's LEDs.
Air flow around the unit and through its vents on the side and rear
should not be restricted so that the switch can maintain adequate
cooling.
Do not place objects on top of the switch.
Do not expose the switch to moisture or water.
Ensure that the site is in a dust-free environment.
You should use dedicated power circuits or power conditioners to
supply reliable electrical power to the network devices.

Advertisement

Table of Contents
loading

Table of Contents