Allied Telesis CentreCOM GS970M Series Installation Manual page 82

Managed gigabit ethernet switch
Hide thumbs Also See for CentreCOM GS970M Series:
Table of Contents

Advertisement

Chapter : Chapter 2: Installation
72
3. Plug the other end of the power cord into a wall outlet.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
Pluggable Equipment: The socket outlet shall be installed near the
equipment and shall be easily accessible.  E5
4. Verify that the POWER LED is green. If the LED is OFF, see Chapter
3, "Chapter 3: Troubleshooting" on page 81.
The switch is now powered on and ready for network operations.
The switches are shipped with the management software pre-installed.
The software provides a command line interface and a GUI (Graphical
User Interface) for in-band, over-the-network management.
For full product documentation, see our online documentation Library. For
AlliedWare Plus products, the Library includes the following documents:
Feature Overview and Configuration Guides - find these by clicking
here and searching for the feature name.
Datasheet - find this by clicking here and searching for GS970M.
Command References - find these by clicking here and searching for
GS970M.

Advertisement

Table of Contents
loading

Table of Contents