Before Connecting; In Using - Pylontech Force-H1 Operation Manual

Lithium-ion phosphate energy storage system
Table of Contents

Advertisement

1.2 Before Connecting

1) After unpacking, please check product and packing list first, if product is damaged or lack
of parts, please contact with the local retailer;
2) Before installation, be sure to cut off the grid power and make sure the battery is in the
switched-off mode;
3) Wiring must be correct, do not mistake the positive and negative cables, and ensure no
short circuit with the external device;
4) It is prohibited to connect the battery and AC power directly;
5) Battery system must be well ground and the resistance must be less than 100mΩ;
6) Please ensured the electrical parameters of battery system are compatible to related
equipment;
7) Keep the battery away from water and fire.

1.3 In Using

1) If the battery system needs to be moved or repaired, the power must be cut off and the
battery is completely shut down;
2) It is prohibited to connect the battery with different type of battery.
3) It is prohibited to put the batteries working with faulty or incompatible inverter;
4) It is prohibited to disassemble the battery (QC tab removed or damaged);
5) In case of fire, only dry powder fire extinguisher can be used, liquid fire extinguishers are
prohibited;
5/34

Advertisement

Table of Contents
loading

Table of Contents