Handling And Placement Of The Battery Module; Handling And Placement Of The Base; Selection Of Installation Sites - Pylontech Force-H1 Operation Manual

Lithium-ion phosphate energy storage system
Table of Contents

Advertisement

3.4.1 Handling and placement of the battery module

Single battery module is 36kg. If without handling tools must have more than 2 men to handling
with it.

3.4.2 Handling and placement of the base

The base is light, single person can handle with it.

3.4.3 Selection of installation sites

A. Force-H1 system working temperature range: 0℃~50℃; Optimum temperature: 18℃~28℃.
Do not place the battery system in direct sun light. It is suggested to build sunshade equipment.
In cold area the heating system is required.
B. Force-H1 system must not be immersed in water. Cannot be placed the battery base in rain
or other water sources. As a suggestion, the base's height should >300mm above the ground.
C. The base's weight capacity should support the weight of whole battery system (130~300kg).
16
/34

Advertisement

Table of Contents
loading

Table of Contents