Commissioning
When the voltages are fed separately using two power supplies, the supply voltage for the
control system and the supply voltage for the semiconductor outputs are galvanically
isolated.
6.3.1

Load project from chip card

Procedure:
Insert the chip card containing the current project into the card slot on the base unit.
}
Switch on the supply voltage. The LC display shows the project name, CRC sum and
}
the date the project was created. Please check this information.
Load the project by pressing the rotary knob. For the project to be downloaded, the
}
rotary knob must be held down for between 3 and 8 seconds. Once the project has
been successfully downloaded, the status of the inputs and outputs will be shown on
the display.
6.3.2

Load project via USB port

Procedure:
Insert a chip card into the card slot on the base unit.
}
Connect the computer containing the PNOZmulti Configurator to the base unit via the
}
USB port.
Switch on the supply voltage.
}
Download the project (see PNOZmulti Configurator's online help).
}
Once the project has been successfully downloaded, the status of the inputs and
}
outputs and the supply voltage will be shown on the display. The "RUN" LED will be lit.
Operating Manual PNOZ m B0
1002660-EN-02
ATTENTION!
Do not connect or disconnect expansion modules and terminators during
operation.
18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

772 100

Table of Contents