Download Print this page

KidKraft MEADOWVALE II Installation And Operating Instructions Manual page 27

Play system

Advertisement

Step 12: Floor Assembly cont.
D: In between (A3) CE Gap Boards and (A8) Centre Board place 4 (A4) Floor Boards making sure all boards are
evenly spaced. Attach to (A15) Side Joist, (A16) Floor Joist and (A17) Floor Front using 5 (S2) #8 x 1-1/2" Wood
Screws per board. (fig. 12.4)
Fig. 12.4
Wood Parts
4 x
Floor Board 1 x 6 x 23-1/2"
A4
Step 9b Floor Asy
A24
A15
not shown
A4
20 x
x 5
S2
A8
per
board
A17
A3
Hardware
S2
#8 x 1-1/2" Wood Screw
27
A3

Advertisement

loading

This manual is also suitable for:

F24035ex