Why Do Maintenance - GE LOGIQ e Basic Service Manual

Hide thumbs Also See for LOGIQ e:
Table of Contents

Advertisement

Why do Maintenance

Keeping Records
Quality Assurance
LOGIQ e – Basic Service Manual
5461614-100 English Rev. 6
It is good business practice that ultrasound facilities maintain
records of quality checks and corrective maintenance. The
Ultrasound Inspection Certificate (provided on
Work' on page
12-35) provides the customer with
documentation that the ultrasound scanner is maintained on a
periodic basis.
A copy of the Ultrasound Periodic Maintenance Inspection
Certificate should be kept in the same room or near the scanner.
In order to gain accreditation from organizations such as the
American College of Radiology (USA), it is the customer's
responsibility to have a quality assurance program in place for
each scanner. The program must be directed by a medical
physicists, the supervising radiologist/physician or appropriate
designee.
Routine quality control testing must occur regularly. The same
tests are performed during each period so that changes can be
monitored over time and effective corrective action can be
taken.
Testing results, corrective action and the effects of corrective
action must be documented and maintained on the site.
Your GE service representative can help you with establishing,
performing and maintaining records for a quality assurance
program. Please contact us for coverage information and/or
price for service.
Care & Maintenance
'Inspection Paper
12-25

Advertisement

Table of Contents
loading

This manual is also suitable for:

548351854835225498957549958254835205483521

Table of Contents