Chapter 3 Installation; Prior To Installation; Analyzer Site Preparation; Installation Connections - Ametek 303B User Manual

Moisture monitor
Table of Contents

Advertisement

Prior to Installation

Read this entire section before beginning installation of the 303B Moisture Analyzer.
!
Failure to do so, and / or use of the Analyzer in a manner not specified in this manual,
may impair the protection against fire, electrical shock and personal injury originally
WARNING
provided by this equipment.

Analyzer Site Preparation

General
This section provides instructions to connect and apply power to the 303B and to connect
it to a sample source. Refer to Appendices B and C for additional sampling considerations
and parameters affecting operation.
Inspection
Inspect the instrument for damage. It is the user's responsibility to report shipping damage
to the carrier and to file a claim for damage.

Installation Connections

Analog Output / Alarm
1.
Remove the screws and the cover. Check that all electrical and tubing
connections are secure.
2.
If used, feed the recorder and/or alarm wires through the 4-20 mA
ANALOG OUTPUT gland (figure 3-1); connect the analog output wires
to JP1-1 (+) and -2 (–) on the display board; connect the alarm wires to
JP1-4 (NC), -5 (COM), and -6 (NO) (figure 3-2).
INSTALLATION
|
Installation
3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents