SET-UP AND INSTALLATION
A08237
6
#79A Fixed Jib
5
2
4-221
3
#55, #55A, or
#55-79A Boom
5
4-223
3
4-130
11
10
12
9
4
1
6
8
7
9
7
4
1
2
Published 12-05-17, Control # 032-23
13
Extended Upper Point
on #55-79A Boom
12
6
5
2
3
4-222
Item Description
1
Drum 1 – Hoist (in boom insert)
2
Drum 2 – Hoist (in boom butt)
3
Drum 3 – Whip (in crane)
4
Guide Sheaves in Boom
5
Guide Sheaves in Mast
6
Boom Top Wire Rope Guide
7
To Lower Boom Point
8
Standard Upper Boom Point
9
For Luffing Hoist Only
10
Guide Sheaves in Strut (luffing jib only)
11
Jib Top Wire Rope Guide
12
To Lower Jib Point
13
Upper Jib Point
14
Extended Upper Boom Point — Lower Point
15
Extended Upper Boom Point — Upper Point
18000 OPERATOR MANUAL
15
14
9
Reeve Lower Point (14) from Left
to Right when Drum 1 is Used
(Standard Arrangement)
Reeve Lower Point (14) from Right
to Left when Drum 2 is Used
(Optional Arrangement)
4
1
FIGURE 4-76
Need help?
Do you have a question about the 18000 and is the answer not in the manual?