9 Electrical installation
In this chapter
9.1 About connecting the electrical wiring
9.1.1 Precautions when connecting the electrical wiring
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
4P620241-1 - 2020.06
9.1
9.1.1
9.1.2
9.1.3
About electrical compliance ..................................................................................................................................
9.1.4
9.1.5
9.2
Connections to the outdoor unit............................................................................................................................................
9.2.1
9.2.2
9.2.3
9.2.4
External backup heater kit ..................................................................................................................................... 101
9.2.5
To connect the user interface................................................................................................................................ 108
9.2.6
To connect the shut-off valve ................................................................................................................................ 111
9.2.7
9.2.8
9.2.9
To connect the alarm output ................................................................................................................................. 113
9.2.10
9.2.11
9.2.12
9.2.13
9.2.14
To connect a Smart Grid ........................................................................................................................................ 118
Before connecting the electrical wiring
Make sure the water piping is connected.
Typical workflow
Connecting the electrical wiring typically consists of the following stages:
▪
"9.2 Connections to the outdoor
DANGER: RISK OF ELECTROCUTION
WARNING
ALWAYS use multicore cable for power supply cables.
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
WARNING
▪
All wiring MUST be performed by an authorised electrician and MUST comply
with the applicable legislation.
▪
Make electrical connections to the fixed wiring.
▪
All components procured on-site and all electrical construction MUST comply
with the applicable legislation.
4
unit" [
91]
9].
9
Electrical installation
|
"2 General safety
Installer reference guide
87
87
88
89
89
90
91
96
97
87