Flow Of Unpacking And Installation - Konica Minolta REGIUS 110 HQ Installation Manual

Direct digitizer
Hide thumbs Also See for REGIUS 110 HQ:
Table of Contents

Advertisement

2.1

Flow of Unpacking and Installation

This section describes the workflow from unpacking to installing the delivered product.
Unpacking
Removing Protective Parts
Changing Operation Panel
Installation Position
(Vertical Installation
Configuration Only)
Moving to and Fixing at
Installation Location
Checking of Input Voltage
Connecting Power Cable
Checking Startup and
Shutdown
Unpacking and Completion
of Installation
Item
Unpack goods after arrival.
For further details, refer to
Remove the protective parts from the machine interior.
For further details, refer to
For the vertical installation configuration, change the installation position
of the operation panel.
For further details, refer to
Position".
Move the machine and fix it at the installation location.
For further details, refer to
Location".
Check the input voltage.
For further details, refer to
Connect the power cable.
For further details, refer to
Check that the machine starts up and shuts down properly.
For further details, refer to

2.1 Flow of Unpacking and Installation

Outline
"2.2
Unpacking".
"2.3 Removing Protective
"2.4 Changing Operation Panel Installation
"2.5 Moving to and Fixing at Installation
"2.6 Checking of Input
"2.7 Connecting Power
"2.8 Checking Startup and Shutdown of
2-2
Parts".
Voltage".
Cable".
Unit".