Checking Unpacking Area; Checking Transfer Path; Checking Network - Konica Minolta REGIUS 110 HQ Installation Manual

Direct digitizer
Hide thumbs Also See for REGIUS 110 HQ:
Table of Contents

Advertisement

1.1.5 Checking Unpacking Area

Check that the unpacking area meets the following requirements:
Check that the area has an indoor environment equivalent to that of the installation location.
Make a space as described below available for performing unpacking work.
1000mm minimum
800mm minimum
2000mm minimum

1.1.6 Checking Transfer Path

The unit has casters for mobility.
Check that the transfer path from the unpacking area to the installation location meets the following
requirements:
There are no steps or steep slopes, etc. that may affect the unit during transfer.
The doorway of the room through which the unit (width: 365mm) will pass through should be
sufficiently large.
There should be no deformations on the floor surface even after transporting the unit (weight:
approximately 102kg).

1.1.7 Checking Network

When connecting to the facility network, contact the network administrator for the following information.
IP address and subnet mask of the unit
IP address of the gateway (if a gateway is used)
Packing case
800mm miminum
Front
Packing label
2520mm minimum
The surface where a packing label is attached along the longer side is the front side.
1-4
1.1 Preparations for Installation
3460mm
minimum

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

0404

Table of Contents