2.4 Changing Operation Panel Installation Position
8
Remove the operation panel.
•
Four tapping screws (M4 × 10)
9
Install the operation panel in the place where the
dummy operation panel was installed.
•
Four tapping screws (M4 × 10)
Confirm that the light-shielding sponge is
contained properly in the cable area for the
Important
operation panel.
10
Connect the operation panel cable as shown in
the figure.
•
Clamps at four locations
11
Install the dummy operation panel.
•
Four tapping screws (M4 × 10)
Install the operation panel so that the bottom
side of the "Loading Cassette/Do Not Sit
Important
On" label shows on the operation side.
2-19