Preparations For Installation; Checking Installation Requirements - Konica Minolta REGIUS 110 HQ Installation Manual

Direct digitizer
Hide thumbs Also See for REGIUS 110 HQ:
Table of Contents

Advertisement

1.1

Preparations for Installation

Check the following items prior to installation.

1.1.1 Checking Installation Requirements

Check that the installation location meets the following requirements.
Installation location
Place where the machine is not exposed to water.
Place where atmospheres pressure, temperature, humidity, ventilation, sunlight, dust, salt,
inflammable gas or air containing sulphur does not adversely affect the machine.
Place where the machine is level and not subject to floor unevenness, vibration or shock (including
during transportation).
(The maximum level difference that can be accommodated with the adjuster feet of the unit is
12mm.)
Place where chemicals are not stored.
Place where gas is not emitted.
Place away from noise sources.
Place away from underfloor cables or pipe bit covers.
(Stripes may appear in the image.)
Installation Space
Find a place where an installation location as shown below can be secured.
Horizontal installation
150mm minimum
600mm
minimun
700mm minimun
100mm
minimum
Front
1440mm minimun
1-2

1.1 Preparations for Installation

Vertical installation
100mm
minimum
150mm
1215mm
minimum
minimum
Front
700mm
minimum
815mm minimum
300mm
minimum
1540mm
minimum

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

0404

Table of Contents