1.3
Installation Workflow
To realize efficient installation, follow the workflow shown below.
Unpacking and Installation
System Connection and
Operation Check
Installation Completed
Item
Perform the work from unpacking and installing the delivered product to
checking the startup of the single unit.
1. Unpacking
2. Removing Protective Parts
3. Changing Operation Panel Installation Position (Vertical Installation
Configuration Only)
4. Moving to and Fixing at Installation Location
5. Connecting Power Cable
6. Checking Startup and Shutdown
For further details, refer to
Connect the unit to the system. Check that the machine operates
properly in the system before handing it over to the user.
For further details, refer to
Check".
Outline
"Chapter 2 Unpacking and
"Chapter 3 System Connection and Operation
1-8
1.3 Installation Workflow
Installation".