With the top of the first front panel in an inclined
position, turn the rotation plates on both sides of
the front side as shown in the figure.
The casters on the front side are placed on the palette.
11
Check the condition of the installed slope.
The tenons on the slope must be inserted into the
holes in the palette.
The buffer material is placed at the correct height
under the slope.
If the slope is not installed correctly, it may
fall off the palette when moving down the
Caution
main unit, causing the main unit to tip over.
This can also cause personal injury.
12
Carefully move the main unit down the slope,
while supporting the main unit with both hands.
Move one side of the main unit and then the other, so
that the casters touch the floor one after another.
A jolt may be felt at the moment when the
main unit comes off the slope and onto the
Caution
floor. Move the main unit as slowly as
possible.
13
Remove the tape from eight places to remove two
buffer materials from the bottom of the device.
Once you remove these tapes, pull the buffer material
toward the arrow indicated in the illustration.