Unpacking - Konica Minolta REGIUS 110 HQ Installation Manual

Direct digitizer
Hide thumbs Also See for REGIUS 110 HQ:
Table of Contents

Advertisement

2.2

Unpacking

This section describes the packaging format of the product and the procedure for unpacking the product
after its arrival.
The unit weighs approximately 102kg. Secure sufficient space to transport and move it, and
work carefully.
Caution
Place a palette in a level location before starting unpacking. If unpacking is carried out on a
sloping surface, the machine may move.
Unpack the product in an area with sufficient space.
When the product is unpacked in a place other than the installation location, check that there
Important
are no steps or obstacles in the way to the installation location.
For information about the unpacking space, refer to
If the machine is unpacked immediately after it is moved in, dew condensation may form
inside the machine due to indoor/outdoor temperature differences (approximately 10°C or
more). To prevent this, let the product stand for approximately one hour at the installation
location before unpacking.
Requirements
The procedures described in this manual require the following tools:
No.
1
Cutter
It is recommended that a cutter with a guide be used to avoid damaging
the main unit when opening the moisture-proof bag.
Note
Name of the recommended product: Opener
Manufacturer: OLFA
Product number: 30B
Tools
No.
2
2-3
"1.1.5 Checking Unpacking
Tools
Cutter with a guide

2.2 Unpacking

Area".

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

0404

Table of Contents