Running The Gth Ibert Demonstration; Connecting The Gth Transceivers And Reference Clocks - Xilinx Virtex-7 FPGA VC7215 Getting Started Manual

Characterization kit ibert
Hide thumbs Also See for Virtex-7 FPGA VC7215:
Table of Contents

Advertisement

Chapter 1: VC7215 IBERT Getting Started Guide

Running the GTH IBERT Demonstration

The GTH IBERT demonstration operates one GTH Quad at a time. This section describes
how to test GTH Quad 115. The remaining GTH Quads are tested following a similar series
of steps.

Connecting the GTH Transceivers and Reference Clocks

Figure 1-1
Note:
X-Ref Target - Figure 1-1
8
Send Feedback
shows the locations for all GTH transceiver Quads on the VC7215 board.
Figure 1-1
is for reference only and might not reflect the current revision of the board.
Figure 1-1: GTH Quad Locations
www.xilinx.com
VC7215 Getting Started Guide
UG970 (v7.0) November 24, 2014

Advertisement

Table of Contents
loading

Table of Contents