Download Print this page

KidKraft BROCKWELL Installation And Operating Instructions Manual page 46

Advertisement

Step 14: Swing Beam Assembly
Part 1
A: Attach 6 Heavy Duty Swing Hangers to (140) Engineered SW Beam using 2 (G13) 5/16 x 6-1/8" Hex Bolt
(with 2 flat washers, plastic formed washer and lock nut) per swing hanger, as shown in fig. 14.1 and 14.2.
B: Attach 1 Spring Loaded Quick Link to each Heavy Duty Swing Hanger. (fig. 14.3)
C: Install 1 (WB7) 5/16 x 3" Wafer Bolt (with flat washer and t-nut) in the middle bolt hole, from the bottom
up, in (140) Engineered SW Beam as shown in fig. 14.1 and 14.4. IT IS IMPORTANT THAT THIS BOLT IS
ATTACHED. IT WILL MINIMIZE CHECKING OF WOOD.
D: Attach KidKraft Plaque to centre of (140) Engineered SW Beam (over top of t-nut) using 4 (S18) #6 x 1"
Wood Screws. (fig. 14.5)
Fort End
Heavy Duty
Swing Hanger
Fig. 14.2
G13
5/16"
T-Nut
Fig. 14.4
5/16" Flat
Washer
WB7
Wood Parts
1 x
Engineered SW Beam 4 x 6 x 92"
140
140
5/16"
Lock Nut
5/16" Flat
Washer
Plastic
Formed
Washer
140
5/16" Flat
Washer
140
Spring Loaded Quick
Link in the closed
position
12 x
5/16 x 6-1/8" Hex Bolt
G13
(5/16" flat washer x 2, 5/16" lock nut & plastic formed washer)
1 x
5/16 x 3" Wafer Bolt
WB7
(5/16" flat washer, 5/16" t-nut)
4 x
S18
#6 x 1" Wood Screw
Heavy Duty
Swing Hanger x 6
Heavy Duty
Swing Hanger
Caution: The Spring Loaded Quick Link
must be attached to the Heavy Duty Swing
Hanger in the closed position. (fig. 14.4)
Hardware
46
Fig. 14.1
Swing End
Fig. 14.3
Spring
Loaded
Quick Link
Fig. 14.5
KidKraft Plaque
S18
Other Parts
6 x Heavy Duty Swing Hangers
6 x Spring Loaded Quick Link
1 x KidKraft Plaque
x 4
140

Advertisement

loading

This manual is also suitable for:

PrestonTwin mountain lodgeF24810F24800F25700z