Ametek Spectro MIDEX Original Operating Instructions page 14

M-xrf spectrometer
Table of Contents

Advertisement

Transportation / Setting-up
No.
Component
1
Acknowledgement (deactivation) of
alarm signal
2
UPS ON/OFF
3
Power connection points for
instruments
When changing or reconnecting the UPS, proceed as follows:
1.
Connect all components with the UPS (instrument, PC, monitor, etc.)
2.
Connect the UPS with the power supply.
3.
Switch on the UPS.
4.
Switch on the components (instrument, PC, monitor, etc.).
The UPS is now installed.
— 14
No.
Component
4
PC communication port
5
Automatic circuit breaker, 6 A
6
UPS power supply connection point
SPECTRO MIDEX — 05.10.2017

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mid05

Table of Contents