Installation; Before Unpacking; Inspecting; Mounting The Adept Smartvision Ex - adept technology SmartVision EX User Manual

Table of Contents

Advertisement

The Adept SmartVision EX should be shipped and stored in the Adept-supplied packaging, which
is designed to prevent damage from normal shock and vibration. You should protect the package
from excessive shock and vibration. For environmental specifications, refer to
Specifications" section on page
3.1

Before Unpacking

Carefully inspect all packaging for evidence of damage during transit. If any damage is indicated,
request that the carrier's agent be present at the time the package is opened.

Inspecting

Compare the actual items received (not just the packing slip) with your equipment purchase
order, and verify that all items are present and that the shipment is correct. Inspect each item for
external damage as it is unpacked. Contact Adept immediately if any damage is evident. See
"How Can I Get Help?" section on page
Retain all containers and packaging materials. These items may be needed in the future to settle a
damage claim.
Remove the Adept SmartVision EX. Mount it near the robot.
3.2

Mounting the Adept SmartVision EX

Space Around the Chassis

When the Adept SmartVision EX is installed, you must allow 10 mm at the back of the unit and 13
mm on the sides of the unit for proper air circulation.

Mounting Options

The following mounting options are available for the Adept SmartVision EX:
• Rack
• Panel
• Desktop
• Stack (one unit placed on top of another)
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
65.
15.
Adept SmartVision EX User's Guide, Rev B

Installation

3
"Environmental
21

Advertisement

Table of Contents
loading

Table of Contents