First Commissioning; Lubrication - Optimum OPTimill MH 35G Operating Manual

Table of Contents

Advertisement

3.6

First commissioning


Qualification on page 12
WARNING!
First commissioning may only take place after proper installation.
First commissioned of the milling machine by inexperienced personnel or inexperienced
users constitute a risk to personnel and equipment. We do not accept any liability for
damages caused by incorrectly performed commissioning.
ATTENTION!
Before commissioning the machine, all bolts, fastenings and protections must be
checked and retightened as necessary!
ATTENTION!
Before commissioning the machine, the level of the gearbox must be checked. During
the transportation of the machine, oil can come up from the vent hole of the gearbox.
WARNING!
The use of improper tool holders or their operation at inadmissible speeds constitutes a
hazard.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
Only use tool holders in the intended admissible speed range.
Tool holders may only be modified in compliance with the recommendation of OPTIMUM
or the clamping device manufacturer.
3.7

Lubrication

With the first lubrication and greasing your new machine, oil in
the gearbox is filled. Once these operations have been carried
out, the machine can be started up.
The oil tank of the gearbox must be filled to half way up the
sight glass. Filling quantity about 1 liters.
The oil must be changed 200 hours after being filled for the
first time, then after every 2000 operating hours.
Use the oil types recommended in the reference table

Lubricant on page 75. This table can be used to com-
pare the characteristics of each different type of oil of your
choice.
Version 1.1.0 - 2020-08-07
Translation of original instruction
MH35G│MH35V
EN
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimill mh 35v33381653338170

Table of Contents