Fastening To The Machine Base; Dimensions, Recesses For Fastening The Machine; First Commissioning - Optimum OPTImill MH 22V Operating Manual

Table of Contents

Advertisement

foundation must be level. Check that the milling machine foundation is horizontal by
using a spirit level.
Fix the milling machine to its foundation at the recesses provided on the machine base for
this purpose.
3.6

Fastening to the Machine Base

3.6.1

Dimensions, recesses for fastening the machine

A
3.7

First commissioning


Qualification on page 10
WARNING!
First commissioning may only take place after proper installation.
First commissioned of the milling machine by inexperienced personnel or inexperienced
users constitute a risk to personnel and equipment. We do not accept any liability for
damages caused by incorrectly performed commissioning.
ATTENTION!
Before commissioning the machine, all bolts, fastenings and protections must be
checked and retightened as necessary!
WARNING!
The use of improper tool holders or their operation at inadmissible speeds constitutes a
hazard.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
EN
MH22V│MH22VD
24
A
A-A
250
274
Translation of original instruction
238
220
Version 1.0.4 - 2020-07-28