OptiView
Getting Started Guide
Turning on the Analyzer
To turn on the analyzer, do the following:
1. Plug the supplied AC power cord into the power receptacle on the
analyzer's back panel.
2. Move the power switch to the
The power switch is located on the back panel above the power
cord receptacle.
The
PWR
is turned on.
When the analyzer powers on, it performs a sequence of operations,
which includes initializing the processor and memory. If a link is
established on the
front panel (see Figure 2 or 3) lights solid green. If there is activity on
the link, this
, these
DCE
14
on the front panel lights blue to indicate that the analyzer
LED
MANAGEMENT
flashes green. If there is a valid signal on the
LED
s light solid green.
LED
position.
On
Note
connection, the
MGMT LINK
on the
LED
and
DTE
Need help?
Do you have a question about the OptiView T1/E1 and is the answer not in the manual?