Initial Operation / Configuration - Kessel Staufix Instructions For Installation, Operation And Maintenance

Backwater valve
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 31
5

Initial operation / configuration

In operation, the emergency closure (1.3 Fig. 4) must be opened (upper position).
5.1
Switch the control unit on
Note: The control unit is disabled when the equipment is
delivered. If an acoustic signal is sounded and the green
LED <1> flashes once when the bell key is pressed, the
control unit is already switched on.
Switching the control on / switching on again after battery
replacement
• Keep the bell key pressed for longer than 2 seconds, the
red and green LEDs flash, in the case of factory settings
one acoustic signal is sounded and with a wireless receiver
connected two acoustic signals are sounded. A self-test is
carried out, then the control unit is ready for operation (refer
also to 6.1)
Initial operation / configuration
44 / 180
1
Ill. [11]
016-023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Staufix control

Table of Contents