Kessel Staufix Instructions For Installation, Operation And Maintenance page 50

Backwater valve
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 31
Initial operation / configuration
5.4
Declare ready for operation
The system is ready for operation if:
– all the points described under 5.3 work perfectly.
– the emergency closure is opened 5.6
– the one-handed closure of the lockable cover is closed, see Ill. [16]
50 / 180
016-023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Staufix control

Table of Contents