ECAT-2011H EtherCAT Slave I/O module
3.3 Self-Test
This chapter can give you the detail steps about self-test. In this way, user can confirm that
ECAT-2011H well or not. Before the self-test, you must prepare a stable signal source (e.g., dry
battery) is available, and than follow the steps described below:
Wire the stable signal source (e.g., dry battery) to AI channel 0.
Connect the V0- (Pin01) to signal positive(-).
Connect the V0+ (Pin02) to signal positive(+).
Dry Battery
(+)
(-)
Figure 3-3.1
In the left-hand window, click "AI0" to get and configure state.
In the right-hand window, check the voltage vaule in the "Value" item.
Figure 3-3.2
Copyright © 2018 ICP DAS CO., Ltd. All Rights Reserved.
- 20 -