Download Print this page

Peri MULTIPROP Instructions For Assembly And Use page 6

Standard configuration

Advertisement

Introduction
Target groups
Contractors
These Instructions for Assembly and
Use are designed for contractors who
use the scaffolds either to
assemble, modify and dismantle the
ƒ
formwork system, or use
e.g. for concreting, or
ƒ
who have them used, e.g. for forming
ƒ
operations.
Construction site coordinator
The Safety and Health Protection
Coordinator*
is appointed by the client,
ƒ
must identify potential hazards during
ƒ
the planning phase,
determines measures that provide
ƒ
protection against risks,
creates a safety and health protection
ƒ
plan,
coordinates the protective measures
ƒ
for the contractor and site personnel
so that they do not endanger each
other,
monitors the compliance with the
ƒ
protective measures.
* Valid in Germany: Regulations for Occupa-
tional Health and Safety on Construction
Sites 30 (RAB 30)
Additional technical documentation
Approvals:
ƒ
– Approval Z-8.22-802 Shoring System MULTIPROP
– Approval Z-8.312-824 Alu Beam MULTIPROP
Type tests:
ƒ
– MULTIPROP System
– MULTIPROP System with Base MP 50
– Compression Brace Head MP/SRU with MULTIPROP
Instructions for Assembly and Use:
ƒ
– MULTIPROP MP 120, 250, 350, 480, 625 Slab Props
– SKYDECK Panel Slab Formwork
– GRIDFLEX Girder Grid Slab Formwork
– MULTIFLEX Girder Slab Formwork
4
Qualified persons
Due to the specialist knowledge gained
from professional training, work experi-
ence and recent professional activity,
the qualified person has a reliable under-
standing of safety-related issues and
can correctly carry out tests. Depending
on the complexity of the test to be un-
dertaken, e.g. scope of testing, type of
testing or the use of a certain measuring
device, a range of specialist knowledge
is necessary.
Technically qualified personnel
The scaffolding may only be assembled,
modified or dismantled by personnel
who are suitably qualified to do so. For
the work to be carried out, the technical-
ly qualified workers must have received
instructions** which contain at least the
following points:
An explanation of the plan for the as-
ƒ
sembly, modification or dismantling of
the scaffolding in an understandable
form and language.
Description of measures in order to
ƒ
safely assemble, modify or dismantle
the scaffolding.
Designation of the preventive meas-
ƒ
ures to avoid the risk of persons and
objects falling.
** Instructions are given by the contractor him-
self or a qualified person selected by him.
Instructions for Use:
ƒ
– Trolley with Winch
– Pallets and Stacking Devices
Data Sheet for Anchor Bolt PERI 14/20 x 130
ƒ
PERI Design Tables
ƒ
Brochure:
ƒ
– MULTIPROP Aluminium Slab Props
Designation of the safety precautions
ƒ
in the event of changing weather con-
ditions which could adversely affect
the safety of the scaffolding as well
as the personnel concerned.
Details regarding the permissible
ƒ
loads.
Description of any other risks that are
ƒ
associated with the assembly, modifi-
cation or dismantling procedures.
In other countries, ensure that the
relevant national guidelines and
regulations in the respective current
version are complied with!
Instructions for Assembly and Use – Standard Configuration
MULTIPROP System

Advertisement

loading
Need help?

Need help?

Do you have a question about the MULTIPROP and is the answer not in the manual?

Questions and answers