Monitor Test - GE Voluson 730Pro Service Manual

Hide thumbs Also See for Voluson 730Pro:
Table of Contents

Advertisement

GE M
S
- K
EDICAL
YSTEMS
D
KTI105947, R
IRECTION
1.) Click the MAINTENANCE REPORT button. The following message box will be displayed.
2.) Fill in the requested information and click OK.
3.) Click the EXIT button on the Service Tools window and the EXIT button on the System Setup
Service page.
NOTE:
After Hardware or Software modifications normally the "Maintenance Report" message box
(see:
Figure
5-15-3-7

Monitor Test

1.) To perform the Monitor test, select the MONITOR TEST button.
The following message appears on the screen.
2.) Read the displayed instructions. Afterwards confirm with YES.
RETZTECHNIK
2
EVISION
Figure 5-41 Maintenance Report
5-41) appears automatically on the screen.
Figure 5-42 Monitor Test - Instructions
Chapter 5 - Components and Functions (Theory)
DRAFT
V
OLUSON
® 730P
/ 730P
V (BT´04)
RO
RO
S
M
ERVICE
ANUAL
5-55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson 730prov

Table of Contents