PIAGGIO Beverly Tourer 300 i.e. Service Station Manual page 187

Hide thumbs Also See for Beverly Tourer 300 i.e.:
Table of Contents

Advertisement

Beverly Tourer 300 i.e.
Check the presence of fixed voltage between the
grey/black cable of the remote control base and
earth. If there is none check the continuity of the
grey/black cable between the fuse box (No. 4 10
A) and the remote control base.
N.B.
CONTINUITY TESTS MUST BE CARRIED OUT WITH THE
COMPONENTS DISCONNECTED. (SOLENOIDS, CON-
TROL UNIT, FUSES ETC.).
After switching to «ON», check that there is battery
voltage, for about 2 seconds, between the Black-
Green cable of the pump connector and the
ground lead with the pump connector disconnec-
ted. Otherwise, check the continuity of the Black-
Green cable between the pump connector and the
solenoid base.
Check the efficiency of the ground line of the fuel
pump by measuring the continuity between the
pump connector black cable, system side, and the
ground.
If, when switching to «ON», the pump continues to
turn after 2 seconds of activation, check, with the
control unit disconnected and the injection load
solenoid disconnected, that the Black-Purple ca-
ble (pin 20 on the interface wiring) is insulated from
the ground.
Specific tooling
020331Y Digital multimeter
Circuit leak test
Install the specific tool for checking the fuel pressure, with the pipe fitted with the gauge.
Injection
INJEC - 187

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents